Multi-location discovery worksheet ================================== Qualify a portfolio site by site, with serviceability and resilience assumptions captured explicitly. Prepared by: __________________ Account / project: __________________ Review date: __________________ 1. Treat each location as a real environment A list of addresses is a starting point. Capture suite and building details, on-site contacts, current carriers, access constraints, and the role of each connection. Sites that share a bandwidth target can differ in availability, resilience needs, and construction exposure. Normalize the address data before sending a batch of RFQs. Notes / evidence: ________________________________________________________ Owner: __________________ Next action / date: __________________ 2. Distinguish coverage from serviceability FCC broadband data can help identify plausible providers. It does not establish the current availability, install cost, or delivery date for your exact suite and service specification. Ask the supplier to confirm serviceability and state survey or construction dependencies. Keep that evidence attached to the site-level option. Notes / evidence: ________________________________________________________ Owner: __________________ Next action / date: __________________ 3. Use one comparison framework Compare MRC, NRC, term, equipment, service characteristics, and delivery assumptions at each site. Keep primary and backup services separate. If physical path diversity matters, request confirmation of the actual routes; different provider names alone do not prove diverse infrastructure. Notes / evidence: ________________________________________________________ Owner: __________________ Next action / date: __________________ 4. Sequence the rollout Agree which sites go first, where a pilot is useful, and how customer acceptance will be recorded. Track milestones by site and maintain an overall program view. Before cancellation of an existing service, confirm the replacement is active and the customer has accepted it. Keep contractual notice periods visible in the plan. Notes / evidence: ________________________________________________________ Owner: __________________ Next action / date: __________________ 5. Use an exception map Mark sites with incomplete addresses, unconfirmed access, construction exposure, or unresolved diversity requirements. Those exceptions deserve attention before the full project is forecast as ready to install. Compare each site’s offers on the same term and technical assumptions. A blended monthly total can be useful, but it should not conceal a location that has no viable confirmed option. Notes / evidence: ________________________________________________________ Owner: __________________ Next action / date: __________________ FINAL REVIEW [ ] Normalized location and suite data [ ] Primary and backup requirements [ ] Confirmed serviceability and dependencies [ ] Comparable MRC, NRC, and terms [ ] Site-level acceptance and rollout plan Related guide: https://net-x.io/blog/multi-location-connectivity/ Original editorial guidance from Net-X. Validate it against your specific agreements and requirements.